Skip to content
The finished two-story building at Alūksnes iela 2 with a gray facade, wood accents and large terraces.

Alūksnes iela 2 on the home stretch

  • Building · Alūksnes iela 2
All news

The facade is done, the lawn is planted and the last interior finishes are going in.

The final work is underway at Alūksnes iela 2. The facade is done: gray fiber cement panels with thermowood accents.

Around the building, the lawn is planted, the thermowood facade texture is refreshed and the parking spaces are marked on the pavers.

The long facade with a thermowood band, large windows and a lawn in front.
The long facade with its thermowood accents.

A heat pump for every apartment

A row of heat pump outdoor units stands along the wall. Every apartment has its own air-to-water heat pump and its own underfloor heating, so each household sets its own temperature and pays only for what it uses.

Heat pumps, parking and the building from the street.

Apartments with a full finish

Inside, the walls are filled and sanded, the laminate is down and some apartments are already complete with a full finish.

Buyers chose their lights and wall colors during construction, so the apartment is just the way they pictured it from day one.

The living room, kitchen and bathroom in one of the finished apartments.
A second-floor terrace with a wooden deck, black railings and a view of the green surroundings.
A second-floor terrace.

More news

Comparison is full

You can compare up to 3 apartments. Choose which one to replace with "".